Sprague v. Commonwealth Edison Co.

OPINION FILED APRIL 18, 1978.

DONALD

v.

SPRAGUE ET AL., PLAINTIFFS-APPELLANTS,

v.

COMMONWEALTH EDISON COMPANY ET AL., DEFENDANTS-APPELLEES.



APPEAL from the Circuit Court of Cook County; the Hon. WILLIAM V. DALEY, Judge, presiding.

MR. PRESIDING JUSTICE STAMOS DELIVERED THE OPINION OF THE COURT:

Rehearing denied May 18, 1978.

This appeal arises from an action brought by plaintiffs, Donald and Kathleen Sprague, to recover for severe and permanent injuries sustained by Sprague and allegedly occasioned by the negligent or wilful and wanton conduct of defendants, Commonwealth Edison Company (hereinafter "Edison") and Gust K. Newberg Construction Company (hereinafter "Newberg"). *fn1 Plaintiff's injuries resulted when a mobile crane, owned and operated by Newberg and for which plaintiff was acting as signalman, contacted an electric power line suspended over the Dresden nuclear power plant located near Joliet, Illinois, and operated by defendant Edison. Upon a jury trial, a general verdict was returned in favor of both defendants and against plaintiff.

Judgment was entered on the verdict and plaintiff currently appeals contending: (1) that the verdict was contrary to the manifest weight of the evidence; (2) that the trial court erred in permitting the jury to consider the issue of plaintiff's contributory negligence or contributory wilful and wanton conduct; (3) that certain evidentiary rulings of the trial court were improper and served to deny plaintiff a fair trial; and (4) that defendant Edison's argument to the jury was improper and prejudicial.

A review of the evidence reveals that on March 1, 1972, plaintiff was employed as a welder and pipefitter by F. Conry Mechanical Contractors and had been assigned as a work foreman on certain construction then underway at the Dresden power plant. Plaintiff had been employed on the site for approximately 4 years and was aware that power lines were suspended overhead which, if contacted by an electrical conductor, would transmit electric current through such conductor. In fact, double circuits of wire were suspended at heights of 21 feet, 26 feet, 6 inches, and 32 feet, and each wire carried 34,500 volts. Atmospheric conditions on the date in question were variously described as "foggy," "misty," "cloudy," and "damp." Under optimum conditions the actual height of these wires was difficult to estimate from ground level due to a lack of visual reference points. Accordingly, normal safety procedures to be employed when operating in the vicinity of such wires included allowing a clearance of 10 feet from the wires.

Plaintiff's assignment on the date in question had been to transport certain pieces of pipe a distance of approximately 125 feet within the confines of the job site and in the immediate vicinity of the power lines suspended overhead. Plaintiff was assisted in this operation by a fellow employee, Sam Bretto, and a Newberg employee, Al Barra, who operated a mobile crane or "cherry picker" which was required to move the pipe sections. On February 28, 1972, two days before the accident, plaintiff and Bretto had unloaded the pipe without incident from a truck by using the "cherry picker" which had been operated by a different Newberg employee, Byril Swanson. Plaintiff acted as signalman *fn2 for Swanson in order to direct the movements of the "cherry picker" and specifically warned Swanson of the power lines.

The mobile crane was equipped with a boom 10 feet in length which could be extended, retracted, raised and lowered by means of controls located in the cabin near the operator's seat. A cable with a hook on its end extended down from the tip of the crane boom and was also operated by a control in the cabin. In order to lift lengthy sections of pipe, the men employed "spreaders" (i.e., two equal length wire cables with a hook on one end and an eye on the other). The hooks on the other end of the cables were either attached to the ends of the pipe or, if the pipe was longer than the "spreaders," the "spreaders" would be wrapped or "choked" around the center of the pipe. The "cherry picker" was equipped with a windshield and a roof window which was covered by a wire mesh guard of unknown specifications. The "cherry picker" was capable of being driven forward under its own power and with the boom in an elevated or lowered position. When in the latter configuration, the boom tip would be 10-12 feet above the ground.

On the date of the accident, plaintiff again acted as signalman and directed Barra in moving the section of pipe as planned. During the maneuver the boom was positioned at a 45° angle. Thereafter, Barra centered the boom and began to lower it to a horizontal position. However, Barra stopped when plaintiff stepped in front of the crane, seized the "spreaders," looped them over his shoulders and motioned to Barra to move forward. Barra complied and the crane moved forward. Barra testified that he kept his eyes trained on Sprague; that he relied upon Sprague exclusively for directions; that he was unaware of the height of the boom at this time; and, that the boom tip was not visible to him due to the inclement weather conditions. Barra did not exit his cabin so as to estimate the height of the boom in relation to the overhead wires and, since Barra was unfamiliar with the area, placed complete reliance upon plaintiff to direct him. Barra indicated that he knew that plaintiff was an experienced workman who had previously worked on the particular job site.

The crane had proceeded forward but a short distance when the boom came into contact with the power line suspended 21 feet above ground level. An explosion followed and electric current was conducted through the crane assembly and into plaintiff's body, causing him severe injuries and necessitating the amputation of plaintiff's left arm.

Photographs taken at the scene shortly after the accident show the boom entangled in the overhead wires suspended approximately 26 feet above ground level. Plaintiff, who characterized himself as a "pretty good judge of distance," testified that he observed the crane boom immediately prior to walking forward and estimated that it was approximately 15 feet above the ground. Plaintiff also stated that in his estimation the lowest power line was approximately 25 feet above ground level; that there was "plenty of room" under the lines within which to maneuver the crane; that it was a customary practice for a workman to carry the "spreaders" if a short distance was to be traversed rather than attach them to the body of the crane; and, had the boom remained in the position at which plaintiff observed it the accident would not have occurred. The testimony of Sam Bretto corroborates plaintiff's estimate of the height of the boom and wires. The several Edison employees who testified at trial also overestimated the height of the power lines.

Plaintiff further testified that while he was walking he did not feel any "pull" on the "spreaders" as might be experienced if the boom had been raised during this time. At trial, Barra denied that he moved the boom after he received plaintiff's signal to proceed forward. It was established that the crane cable could be released while the boom was simultaneously being extended and elevated. However, this would require great dexterity on the part of the operator inasmuch as the maneuver would require moving three levers in different directions while steering the crane. Further, it appears that all the controls were powered by the same system in such a way that the boom would always rise faster than the cable could be paid out. If the boom was raised, the hook and "spreader" assembly would always be raised to some extent. According to operator Swanson, it would be "impossible" to alter the position of the boom either by elevation or extension without changing the position of the hook.

Plaintiff initially contends that the jury's verdict was unreasonable, arbitrary and unsupported by the evidence. In support of this position, plaintiff maintains: (1) that the evidence was sufficient to establish negligence or wilful and wanton conduct on the part of each defendant, which conduct proximately caused plaintiff's injuries; and (2) that, as a matter of law, plaintiff was free of either contributory negligence or wilful and wanton conduct so that the trial court erred in submitting these issues to the jury for its consideration. As we review the case, we can but conclude that it presented factual questions for the jury.

• 1, 2 Wilful and wanton conduct is difficult to define with precision. Whether an act constitutes such conduct is greatly dependent upon the particular facts of each case and it is within the peculiar province of the jury to consider. (Kelly v. Burtner (1941), 310 Ill. App. 251, 33 N.E.2d 754.) A charge of wilful and wanton conduct does not require proof that the party intended that harm should ensue. It is sufficient that the evidence tends to show that the party had notice which would alert a reasonable man that substantial danger was involved and that the party failed to take reasonable precautions under the circumstances. (Hatfield v. Noble (1963), 41 Ill. App.2d 112, 190 N.E.2d 391.) Moreover, one may be guilty of such conduct not only through an error in judgment but also from a failure to exercise judgment. (Dursch v. Fair (1965), 61 Ill. App.2d 273, 209 N.E.2d 509.) In order to establish wilful and wanton conduct the act or omission must not only be negligent but exhibit an utter indifference to or conscious disregard for a person's own safety or the safety of others. Turner v. Commonwealth Edison Co. (1976), 35 Ill. App.3d 331, 341 N.E.2d 488. See also Jarvis v. Herrin City Park Dist. (1972), 6 Ill. App.3d 516, 285 N.E.2d 564.

Plaintiff submits that the evidence was sufficient to establish that defendant Edison was guilty of such conduct in that Edison failed to insulate the wires in the vicinity of the job site, failed to inspect the job site, and failed to provide adequate warning with respect to the height of the various wires.

Whether the defendant power company was negligent for failing to insulate its wires at the location of the accident was a factual question requiring consideration of the particular conditions and circumstances, including whether it was reasonably foreseeable that persons might come into proximity of the wires. (Ploense v. Illinois Power Co. (1971), 2 Ill. App.3d 874, 275 N.E.2d 920.) Electricity is an inherently dangerous and deadly force which should be regarded with a high degree of care by those engaged in the business of supplying electrical energy. *fn3 Clinton v. Commonwealth Edison Co. (1976), 36 Ill. App.3d 1064, 344 N.E.2d 509.

• 3 The evidence in the instant case, together with all reasonable inferences, tends to show that defendant Edison had actual notice that a substantial danger existed. Evidence was also adduced to establish that an unrelated incident occurred at the site approximately 3 months prior to the date of the accident in question when a dump truck struck a wire adjacent to that involved in the instant case. The evidence also tends to establish that aside from this incident the area had been used under construction conditions for an extended period of time without incident. In any case, whether defendant Edison's failure to otherwise inspect the job site, insulate those wires in the immediate vicinity of the job site, or employ other specific warning devices evinces a conscious disregard for or utter indifference to the safety of others present questions properly within the domain of the jury as trier of fact. Spence v. Commonwealth Edison Co. (1975), 34 Ill. App.3d 1059, 340 N.E.2d 550; Burke v. Illinois Power Co. (1978), 57 Ill. App.3d 498, 373 N.E.2d 1354.

Defendant Newberg relies upon the proposition that a failure to see what is visible is not such conduct as is compatible with due caution for one's own safety, and, in the instant case, evidenced a conscious and utter disregard for plaintiff's own safety. (Hedge v. Midwest Contractors Equipment Co. (1964), 53 Ill. App.2d 365, 202 N.E.2d 869.) Indeed, in its brief before this court, defendant Newberg does not expressly dispute plaintiff's contention that Newberg employee, Al Barra, failed to exercise ordinary care with respect to the operation of the "cherry picker." It is well-settled that a party has no right to knowingly expose himself to danger and then recover damages for an injury which might have been avoided by the exercise of the requisite care. Withey v. Illinois Power Co. (1961), 32 Ill. App.2d 163, 177 N.E.2d 254.

• 4 The complaint in the instant case charged defendant Newberg with both negligence and wilful and wanton conduct. No special interrogatories were submitted to the jury with respect to these issues. A general verdict was returned in favor of both defendants and against plaintiff. The general and long accepted rule of law is that contributory negligence of the plaintiff is a defense for a defendant charged with negligence. The corollary of this rule, which is of more recent origin, is that contributory wilful and wanton conduct of the plaintiff is a defense for a defendant charged with wilful and wanton conduct. Only contributory wilful and wanton conduct is a complete defense to an action regarding the same. Zank v. Chicago, Rock Island & Pacific R.R. Co. (1959), 17 Ill.2d 473, 161 N.E.2d 848.

At the outset it must be noted that this operation undertaken at the Dresden work site on Edison property was extremely hazardous, involving heavy construction in the immediate vicinity of highly energized power lines suspended merely 21 feet above ground. Within this context, it cannot be said, as a matter of law, that defendant Newberg was free of negligence or wilful and wanton conduct with respect to the operation of the "cherry picker." By agreeing to maneuver his crane while the boom was in an elevated position and without attempting to personally discern the height of the boom in relation to the overhead power lines, Newberg's employee displayed an obvious lack of care for his own safety and that of others. The jury might have properly found that such carelessness constituted wilful and wanton conduct attributable to defendant Newberg.

Nor may plaintiff, as a matter of law, avoid all responsibility for the unfortunate height of the boom and the accident which occurred as a result. At trial, plaintiff acknowledged that he bore a duty to be on the alert for obviously hazardous conditions such as energized, low-slung, overhead power lines; that he was aware of this particular danger; and, that he did not warn the operator of the hazard.

The testimony of plaintiff and that of his co-worker, Sam Bretto, suggested that the boom was no more than 15 feet above ground level which, if true, would have provided sufficient clearance to avoid the power lines. Their estimates are not beyond question, however, in light of both employee's failure to accurately gauge the height of the power lines. While plaintiff contends that the boom was raised after he estimated its height, plaintiff admits that he felt no "pull" as might have been experienced had such an elevation taken place as he walked forward in advance of the "cherry picker" carrying the "spreader" assembly over his shoulders. Clearly, the boom should have been reduced to its lowest height and plaintiff's signal to the crane operator was instrumental in preventing this ...


Buy This Entire Record For $7.95

Download the entire decision to receive the complete text, official citation,
docket number, dissents and concurrences, and footnotes for this case.

Learn more about what you receive with purchase of this case.